PCB assembly with full traceability.
SMT, through-hole, and mixed-technology assembly with global sourcing, AOI/X-ray inspection, and IPC-certified operators.
- Operator certificationIPC Class II / III
- InspectionAOI and X-ray standard
- Quote response1–2 working days

From bare board to working hardware
Based in Lund, Sweden, Coredeq runs PCB assembly programs from prototype quantities up to volume production. We handle component sourcing, BOM scrubbing, alternates, SMT and through-hole placement, AOI and X-ray inspection, and functional testing, serving hardware teams across the Nordics and Europe.
Every batch ships with a documented traveler, lot-level serialization, and IPC Class II/III sign-off when required. You get electronics that pass audits and ship reliably.
What we build
- High-mix SMT and through-hole assembly
- 0201 components and BGA/QFN placement
- Global component procurement with vetted suppliers
- AOI and X-ray inspection on every panel
- Custom test fixtures and functional testing
- IPC Class II / III qualified operators
- Box build and final mechanical assembly
- RoHS and lead-free processes
How a program runs
Send your design package
Gerbers, BOM, pick-and-place, and any test specs. We accept Altium, KiCad, EAGLE, and ODB++.
BOM scrub and quote
We check availability, flag obsolete or risky parts, and propose alternates. Pricing and lead time come back within 1–2 working days.
Procurement and kitting
We source components, manage long lead-time risk, and prep kits ready for the line.
Assembly and inspection
SMT and through-hole placement, AOI and X-ray, plus any agreed functional tests.
Documented shipment
Lot serialization, traveler, and inspection report ship with every order.
Typical lead times
Working days from kit-complete, excluding shipping. Component availability dominates total elapsed time.
- Prototype (1–10 boards)
- 5–10 days
- Small batch (10–100)
- 10–15 days
- Volume
- 3–6 weeks
- Component sourcing
- Variable
Lines hold IPC-A-610 acceptance criteria. Class III sign-off and full documentation package available on request.
Common questions
More questions? See full FAQ
Plan your PCBA program
Send Gerbers, BOM, and pick-and-place. Our team in Lund scrubs the BOM and quotes within 1–2 working days.
