Tools that survive production, parts that ship.
Production-ready molds, qualified materials, and molded parts at scale. Designed in-house, validated, shipped from EU and Asia.
- Tool ownershipOptional transfer to your facility
- First-articleFAI on every program
- Material rangeEngineering, food-contact, medical

Tooling that runs, parts that pass audits
Based in Lund, Sweden, Coredeq designs and builds injection molds for hardware teams moving from prototype to volume. We handle mold flow analysis, steel selection, mold making, trial shots, dimensional reports, and the full molded-parts program once the tool qualifies.
Keep the tool with us for ongoing molded part orders, or take ownership and have it shipped to your facility. Parts are produced through our audited European and Asian manufacturing partners, with the complete engineering package: CAD, BOM, steel certificates, and maintenance guides.
What we build
- Mold flow analysis and DFM review
- Single, multi-cavity, family, and unscrewing molds
- P20, NAK80, H13, and stainless tool steels
- Engineering, food-contact, and medical-grade resins
- Insert molding and over-molding
- Trial shots with first-article inspection (FAI)
- Production runs from 1k to 1M+ pieces
- Tooling export with full ownership transfer
How a program runs
Design review and mold flow
We review your part and propose tool layout, gating, and cooling. Mold flow analysis is included on every program.
Quote and tool design
You get a fixed-price quote with steel choice, cycle time, and lead time. Tool design is reviewed with you before cutting.
Tool build and trial
Tool is cut and qualified with trial shots. We share parts, dimensional reports, and a tool buy-off package.
Production or tool transfer
Run molded parts with us, or take ownership and ship the tool to your facility with full documentation.
Typical lead times
Working days from approved design. Steel grade, cavity count, and finish requirements drive the schedule.
- Prototype mold (T1)
- 4–6 weeks
- Production mold
- 6–10 weeks
- First trial shots
- +1 week after build
- Production runs
- 2–4 weeks per batch
Mold flow analysis and FAI included as standard. Steel certificates supplied for every tool.
Common questions
More questions? See full FAQ
Plan your tooling program
Send the part design and your target volume. Our tooling engineers in Lund scope steel, cavity count, and a fixed-price quote.
